Engineering consulting
Grid, storage and renewables studies.
What we do
Planning
Viable site, right size, grid-ready.

- Grid connection & power-flow studiesLoading, faults, voltage, reinforcement.
- For
- IPPs, developers, industrial estates
- You get
- Load flow, short circuit, stability
- BESS & solar feasibility studiesResource, design, yield, finance.
- For
- Developers, industry, estates
- You get
- Concept design, hourly yield, finance
- Data centre power & grid supplyGrid, storage, firm green supply.
- For
- Data centre developers, operators
- You get
- Supply options, redundancy, timeline
- Utility-scale BESS studiesFrequency, shifting, firm capacity.
- For
- PLN, IPPs, island grids
- You get
- Sizing, grid services, tender specs
- Policy & programme advisoryEvidence for energy decisions.
- For
- Ministries, agencies, development banks
- You get
- Analysis, options, programme design
- Tender support & site screeningScreen sites before PLN tenders.
- For
- Investors, EPCs, consortia
- You get
- Ranked sites, risks, assumptions
Delivery
Built as it was calculated.

- Design review & owner’s engineerIndependent check through handover.
- For
- Project owners, lenders
- You get
- Findings, verified quantities
- Testing & commissioningMeasured output against the model.
- For
- Asset owners, EPCs
- You get
- Witnessed tests, performance check
Operations
Output on plan, problems early.

- Monitoring & asset performanceLosses found, ranked by value.
- For
- Solar, BESS and plant owners
- You get
- Health scores, losses, reports
- Energy audits & managementCut bills: efficiency, solar, storage.
- For
- Industrial sites, commercial buildings
- You get
- Baseline, measures, reporting
- O&M advisoryMaintenance strategy, fault investigation.
- For
- Operators, in-house teams
- You get
- Maintenance plans, fault investigations
Every study, a working model.
- Load flow, N-1
- Short circuit
- Stability, voltage
Power for data centres.
- Grid capacity and timeline
- N+1 and 2N supply
- BESS, gensets, green PPAs
- PLN 150 kV supplyCapacity and timeline
- Two transformers, 2NNo single point of failure
- BESS bridge, gensetsRide through any outage
- 100 MW IT loadGreen PPA where possible
Questions clients bring
- Data centre, 100 MW ITCan the grid supply it by 2028?Grid options, 2N design, BESS bridge
- BESS, island gridHow much storage cuts diesel?Sizing, dispatch, tender specifications
- Industrial estate, 300 MWCaptive, PLN or both?Supply options, tariffs, wheeling
- Provincial programmeWhich villages get solar first?Screening, costs, phasing
Where we go deepest
- Data centre powerGrid, redundancy, green supply.
- Utility-scale BESSSizing, grid services, revenue.
- Grid integrationHosting capacity, N-1, stability.
- Industrial decarbonisationCaptive power, smelters, estates.
- Island and isolated gridsDiesel to hybrid, firm.
- Policy and programmesEvidence for government decisions.
The team
- PhD-led teamPower systems, storage, markets.
- Global methodsInternational standards and tools.
- Local practicePLN grid code, RUPTL, permits.
- Public sectorAnalysis for government programmes.