Norway will pay for PLN’s solar carbon
At COP31 Norway agreed to buy up to 12 million tonnes of carbon credits from PLN solar projects at USD 20 to 40 a tonne. What the Article 6.2 deal is worth, how it works and what it means for project finance in Indonesia.
Key points
- Norway, through GGGI, agreed to buy up to 12 Mt of CO₂ credits from PLN solar projects over about ten years.
- The reported price of USD 20 to 40 a tonne implies USD 240 to 480 million in total.
- Credits move as ITMOs under Article 6.2, so Indonesia cannot also count them towards its own target.
On 12 November 2026, on the sidelines of COP31 in Turkey, Norway agreed to buy carbon credits from solar projects owned by PLN. The deal was signed by the Global Green Growth Institute (GGGI) on Norway’s behalf and by PLN. It is Indonesia’s first sale of credits under Article 6.2 of the Paris Agreement.
- 12 MtCO₂ credits, at most, over the term
- USD 20–40Reported price per tonne of CO₂e
- ~10 yrsTerm of the agreement
What it is worth
The government gave a price range, not a single price. Multiplying out the volume gives the order of magnitude:
Spread over ten years, the full 12 Mt is about 1.2 Mt a year, worth roughly USD 24 to 48 million a year. That is meaningful money for a programme of solar plants, but small next to Indonesia’s energy subsidy bill or PLN’s capital plan. Its real value is as a precedent.
How Article 6.2 changes the accounting
Older voluntary credits could be sold abroad while the host country still counted the same reduction in its own climate statistics. Article 6.2 closes that loophole. Credits are authorised by Indonesia and transferred as internationally transferred mitigation outcomes (ITMOs). Norway counts them, and Indonesia makes a corresponding adjustment: it adds the tonnes back to its own ledger.
That is the trade-off. Every tonne sold to Norway is a tonne Indonesia cannot use towards its own nationally determined contribution. The deal makes sense for Indonesia if the money brings forward solar that would otherwise come later, so that the country’s own reductions grow faster than the tonnes it gives away.
Why solar, and why PLN
Solar projects are among the easiest to verify: metered output times an agreed emissions factor for the grid they displace. Working through PLN gives the buyer a single, state-owned counterparty with long-lived assets. For PLN, the revenue sits outside the tariff, which has been frozen for most customers since 2017.
What it means for project developers
- A carbon line in the model. For PLN-procured solar, credit revenue could be built into the project case, if PLN shares it with independent power producers. The deal does not say whether it will.
- Monitoring becomes a revenue function. Credits are paid on verified output. Metering quality, data availability and loss accounting now affect income, not just O&M reports.
- More buyers will follow the template. Japan, Singapore and Switzerland all run Article 6.2 programmes. A first transaction with clear rules lowers the cost of the second.
Open questions
- Which PLN solar projects are covered, and whether new tenders such as Mentari Nusantara are included.
- The grid emissions factor used to calculate credits.
- How Indonesia will report the corresponding adjustment in its national inventory.
Sources
- pv magazine, Norway enters carbon credit agreement with Indonesia, 13 November 2026
- Kontan, Norway to buy carbon offsets from Indonesian power projects
- Yahoo News (Reuters), Norway to buy carbon offsets from Indonesian power projects, Indonesia says
- Carbon Pulse, Indonesia and Norway sign Article 6.2 deal for renewable energy credits
- IndexBox, Norway and Indonesia sign ten-year carbon credit agreement
Summaries and analysis by Satu Energy. Programme and plan figures are not operating capacity unless stated.
Satu Energy (PT Satu Solusi Energi), Jakarta. Read online and download the chart data at satuenergy.com/insights/norway-indonesia-carbon-credit-deal/. Contact: contact@satuenergy.com. This report uses public sources only; figures for plans and programmes are not operating capacity unless stated.