How often the lights go out, by the numbers
PLN’s customers lost power for an average of 320 minutes in 2024, down from 338. Outside Java, outages are about twice as frequent. What SAIDI and SAIFI measure, what the 2026 blackouts add, and how sites can protect themselves.
Key points
- SAIDI fell from 338 minutes per customer in 2023 to 320 minutes in 2024; SAIFI from 4.27 to 3.23 interruptions.
- Outages outside Java were about twice as frequent as in Java in 2025, worst in West Kalimantan.
- Averages hide the 2026 Sumatra and Java events, which lasted hours to more than a day.
Utilities measure reliability with two numbers. SAIDI (System Average Interruption Duration Index) is the average number of minutes a customer is without power in a year. SAIFI (System Average Interruption Frequency Index) is the average number of interruptions. Both improved at PLN in 2024.
The national numbers
- 2023
- 2024
Show data
| Item | 2023 | 2024 |
|---|---|---|
| SAIDI, minutes per customer | 338.1 | 320.2 |
Show data
| Year | Value |
|---|---|
| 2023 | 4.27 |
| 2024 | 3.23 |
SAIDI fell 5.3% to 320 minutes, about five and a half hours a year. SAIFI fell 24% to 3.23 interruptions per customer. Partial 2025 data reported by PLN showed SAIDI of 134 minutes and SAIFI of 1.73 by July.
The averages hide the geography
Databoks’ analysis of 2025 data found outages outside Java were about twice as frequent as in Java, with the West Kalimantan unit the worst. That matches the grid: Java-Bali is a dense, meshed 500 kV system; most other islands run on long radial lines with fewer alternative paths.
The averages also hide the big events
SAIDI is an average. It does not describe a 28-hour outage in parts of Sumatra in May 2026, or the rolling blackouts in Java in June. For a factory, one long event matters more than a year of short ones: a process line that trips mid-batch can lose a day of output.
What it means for a site owner
- Know your own SAIDI. Your feeder’s record matters more than the national average. Interval metering logs every interruption and dip.
- Separate short dips from long outages. Voltage dips of a fraction of a second trip sensitive equipment; an uninterruptible power supply or a fast battery covers them. Long outages need stored energy or on-site generation.
- Price the cost of an outage. Lost production, scrap and restart time per hour of outage, multiplied by expected hours, gives a budget for backup that is grounded in your own numbers.
- Combine backup with savings. A battery that only waits for outages is expensive. One that also shifts solar output or cuts peak demand earns its keep every day.
What to watch
- PLN’s full-year 2025 SAIDI and SAIFI, and regional breakdowns.
- Findings of the Sumatra blackout investigation.
- Reliability standards and compensation rules for long outages.
Sources
- CNBC Indonesia, PLN records lower outage duration and frequency in 2024
- Detik, outages fell 24% through 2024
- Bisnis, FKBI highlights the decline in PLN outage index
- Databoks, outages were more frequent outside Java in 2025
- Databoks, ten PLN units with the most frequent outages in 2025
- Wikipedia, 2026 Sumatra blackout