The 10 GW of gas hidden in a green plan
PLN’s RUPTL 2025–2034 is billed as its greenest plan, yet it adds 10.3 GW of gas-fired power, mostly on Java. What that means for LNG imports, costs and the case for solar plus storage.
Key points
- The plan adds 69.5 GW: 42.6 GW new and renewable, 10.3 GW gas, 6.3 GW coal and 10.3 GW storage.
- Every GW of gas needs an estimated 18–24 LNG cargoes a year, so 10.3 GW means about 180–240.
- Critics estimate the gas build-out could cost up to Rp 155.8 trillion a year.
PLN’s electricity supply plan for 2025–2034 (RUPTL) was presented as the greenest in its history, and by share of new capacity it is. But inside the 69.5 GW of additions sits 10.3 GW of new gas-fired power, mostly on Java. Gas is cleaner than coal at the stack. It is also imported fuel, priced in dollars and shipped as LNG.
What the plan adds
- New and renewable
- Storage
- Gas
- Coal
New and renewable includes nuclear in the plan’s classification. Storage covers batteries and pumped hydro.
Show data
| Item | New and renewable | Storage | Gas | Coal |
|---|---|---|---|---|
| RUPTL 2025–2034 | 42.6 | 10.3 | 10.3 | 6.3 |
Show data
| Step | GW |
|---|---|
| New and renewable | 42.6 |
| Storage | 10.3 |
| Gas | 10.3 |
| Coal | 6.3 |
| Total | 69.5 |
One source describes the gas capacity as baseload support for Java. The plan lists at least ten pipeline gas and LNG-to-power projects on Java and Bali between 300 and 1,000 MW.
The fuel bill
A gas plant is cheap to build and expensive to run. One analysis estimates that each gigawatt of gas-fired power needs 18–24 LNG cargoes a year.
Critics have put the cost of the gas expansion at up to Rp 155.8 trillion (USD 9.6 billion) a year. That is their estimate, not an official one, but it shows the scale of the exposure. IESR warned that dependence on 10.3 GW of gas could pose serious long-term energy-security challenges.
Why gas, and what could replace part of it
Gas does three jobs in the plan: it replaces some coal, it provides firm capacity on Java, and it follows load as solar grows. The first two are hard to replace quickly. The third is where batteries now compete.
- Peak and ramping. Short-duration batteries respond faster than gas turbines and are now cheap: stationary storage packs averaged USD 70 per kWh in 2025.
- Evening shifting. Four-hour batteries charged by midday solar cover the early-evening peak that gas peakers serve today.
- Firm overnight supply. This remains the job of gas, hydro, geothermal or coal. Batteries do not yet do it economically at grid scale.
A realistic reading: some of the 10.3 GW should be built, and some can be replaced by solar plus storage. Which part depends on detailed system studies, not on headline capacity.
What it means for developers
- Storage competes with peakers. Battery projects should be pitched against the gas peaking capacity in the plan, on cost per MW of firm peak.
- Watch the LNG terminals. Where regasification is built, gas plants follow. Where it is delayed, solar and storage fill the gap.
- Hybrid sites. Existing gas plant sites have grid connections. Adding batteries there is often the fastest route to new flexible capacity.
What to watch
- Final investment decisions on the Java LNG-to-power projects.
- PLN’s gas and LNG supply contracts and their price indexation.
- The next RUPTL revision and whether battery capacity replaces any gas.
Sources
- Lexology, key takeaways from PLN’s 2025–2034 RUPTL
- Ashurst, Indonesia’s new power development plan: highlights from the 2025–2034 RUPTL
- Indonesia Business Post, gas-fired power plant expansion could cost Indonesia up to Rp 155.8 trillion a year
- IESR, government needs to ensure strategy to achieve renewable energy target in RUPTL 2025–2034
- Business Indonesia, Indonesia unveils 2025–2034 power plan
Summaries and analysis by Satu Energy. Programme and plan figures are not operating capacity unless stated.
Satu Energy (PT Satu Solusi Energi), Jakarta. Read online and download the chart data at satuenergy.com/insights/ruptl-gas-lng-expansion/. Contact: contact@satuenergy.com. This report uses public sources only; figures for plans and programmes are not operating capacity unless stated.