Key points

  • The plan adds 69.5 GW: 42.6 GW new and renewable, 10.3 GW gas, 6.3 GW coal and 10.3 GW storage.
  • Every GW of gas needs an estimated 18–24 LNG cargoes a year, so 10.3 GW means about 180–240.
  • Critics estimate the gas build-out could cost up to Rp 155.8 trillion a year.

PLN’s electricity supply plan for 2025–2034 (RUPTL) was presented as the greenest in its history, and by share of new capacity it is. But inside the 69.5 GW of additions sits 10.3 GW of new gas-fired power, mostly on Java. Gas is cleaner than coal at the stack. It is also imported fuel, priced in dollars and shipped as LNG.

What the plan adds

Gas is a seventh of the new capacityNew capacity in RUPTL 2025–2034, GW
  • New and renewable
  • Storage
  • Gas
  • Coal
RUPTL 2025–203442.610.310.36.369.5 GW

New and renewable includes nuclear in the plan’s classification. Storage covers batteries and pumped hydro.

Source: Lexology; Business Indonesia, 2025Download CSVSatu Energy
Show data
ItemNew and renewableStorageGasCoal
RUPTL 2025–203442.610.310.36.3
How 69.5 GW adds upNew capacity in RUPTL 2025–2034, GW
020406080
+42.6New and renewable
+10.3Storage
+10.3Gas
+6.3Coal
69.5Total
Source: Lexology; Business Indonesia, 2025Download CSVSatu Energy
Show data
StepGW
New and renewable42.6
Storage10.3
Gas10.3
Coal6.3
Total69.5

One source describes the gas capacity as baseload support for Java. The plan lists at least ten pipeline gas and LNG-to-power projects on Java and Bali between 300 and 1,000 MW.

The fuel bill

A gas plant is cheap to build and expensive to run. One analysis estimates that each gigawatt of gas-fired power needs 18–24 LNG cargoes a year.

10.3 GW of gas could need four LNG cargoes a weekEstimated LNG cargoes a year for the planned gas capacity
High estimate (24 per GW) 247 cargoes
Low estimate (18 per GW) 185 cargoes

Assumes the full 10.3 GW runs as baseload. Actual use depends on dispatch.

Source: Satu Energy calculation from the cargoes-per-GW range reported by Indonesia Business PostDownload CSVSatu Energy
Show data
Estimatecargoes
High estimate (24 per GW)247
Low estimate (18 per GW)185

Critics have put the cost of the gas expansion at up to Rp 155.8 trillion (USD 9.6 billion) a year. That is their estimate, not an official one, but it shows the scale of the exposure. IESR warned that dependence on 10.3 GW of gas could pose serious long-term energy-security challenges.

Why gas, and what could replace part of it

Gas does three jobs in the plan: it replaces some coal, it provides firm capacity on Java, and it follows load as solar grows. The first two are hard to replace quickly. The third is where batteries now compete.

  • Peak and ramping. Short-duration batteries respond faster than gas turbines and are now cheap: stationary storage packs averaged USD 70 per kWh in 2025.
  • Evening shifting. Four-hour batteries charged by midday solar cover the early-evening peak that gas peakers serve today.
  • Firm overnight supply. This remains the job of gas, hydro, geothermal or coal. Batteries do not yet do it economically at grid scale.

A realistic reading: some of the 10.3 GW should be built, and some can be replaced by solar plus storage. Which part depends on detailed system studies, not on headline capacity.

What it means for developers

  • Storage competes with peakers. Battery projects should be pitched against the gas peaking capacity in the plan, on cost per MW of firm peak.
  • Watch the LNG terminals. Where regasification is built, gas plants follow. Where it is delayed, solar and storage fill the gap.
  • Hybrid sites. Existing gas plant sites have grid connections. Adding batteries there is often the fastest route to new flexible capacity.

What to watch

  • Final investment decisions on the Java LNG-to-power projects.
  • PLN’s gas and LNG supply contracts and their price indexation.
  • The next RUPTL revision and whether battery capacity replaces any gas.

Sources

  1. Lexology, key takeaways from PLN’s 2025–2034 RUPTL
  2. Ashurst, Indonesia’s new power development plan: highlights from the 2025–2034 RUPTL
  3. Indonesia Business Post, gas-fired power plant expansion could cost Indonesia up to Rp 155.8 trillion a year
  4. IESR, government needs to ensure strategy to achieve renewable energy target in RUPTL 2025–2034
  5. Business Indonesia, Indonesia unveils 2025–2034 power plan

Summaries and analysis by Satu Energy. Programme and plan figures are not operating capacity unless stated.

Download the full report

One energy, limitless solutions.

How can we help?

Send location, capacity and stage. We reply within one working day.

Contact us