Indonesia has about 152 MW of wind, almost all of it at Sidrap and Tolo in South Sulawesi. The RUPTL adds 7.2 GW and PLN plans a 1,275 MW Bayu Nusantara tender. A look at the gap and what closes it.

Download report (PDF)Download data (CSV)
Illustration for Wind power: two farms and a big plan

Key points

  • Indonesia has about 152 MW of wind; Sidrap (75 MW) and Tolo (72 MW) are 96% of it.
  • Capacity has barely changed for years.
  • The RUPTL adds 7.2 GW; PLN’s planned Bayu Nusantara tender alone is 1,275 MW.

Indonesia’s wind sector is two farms in South Sulawesi. The plan is to make it a gigawatt-scale industry within a decade.

Wind in three numbers
  • 152 MWOperating today
  • 7.2 GWPlanned in RUPTL 2025–2034
  • 1,275 MWBayu Nusantara, PLN’s planned wind tender
Source: Sources listed belowDownload CSVSatu Energy

Where it stands

One planned project is eight times today’s wind fleetWind capacity, MW
RUPTL additions to 2034 7,200 MW
Bayu Nusantara (planned tender) 1,275 MW
Installed nationally, 2025 152 MW
Sidrap 75 MW
Tolo 72 MW

Installed estimates range from 152 to 157 MW depending on how small sites are counted.

Source: Climate Scorecard; The Wind Power; Katadata; TaiyangNews, 2025–2026Download CSVSatu Energy
Show data
MeasureMW
RUPTL additions to 20347,200
Bayu Nusantara (planned tender)1,275
Installed nationally, 2025152
Sidrap75
Tolo72

Installed wind is about 152 MW, with Sidrap (75 MW) and Tolo (72 MW) making up more than 96%. No utility-scale wind farm has reached commercial operation since, and the ministry has reported no new wind investment.

What changes next

The RUPTL adds 7.2 GW of wind by 2034; some reports cite higher figures. At COP31, PLN listed PLTB Bayu Nusantara, 1,275 MW, among the projects it plans to launch for contracting in 2026. See the full 10.23 GW list.

Why wind has lagged

  • Resource data. Good wind sites are concentrated in parts of Sulawesi, Nusa Tenggara and southern Java, and long-term measured data is scarce.
  • Grid strength. Weak local grids limit how much variable output can connect.
  • Logistics. Large blades and towers need ports and roads that many sites lack.

Why it matters

Wind often blows when the sun does not, including at night and in the wet season. In systems moving toward high solar shares, even a modest wind share reduces the storage needed to cover the evening. Measured wind data and early grid studies are what turn a plan of 7 GW into bankable projects.

The scale-up the plan asks for

The plan asks wind to grow almost fifty-foldWind capacity, MW
  • Today
  • Plus RUPTL additions
Wind capacity152 → 7,352 MW
Source: Sources listed below; Satu Energy sum of today’s fleet and RUPTL additionsDownload CSVSatu Energy
Show data
ItemTodayPlus RUPTL additions
Wind capacity1527,352

Wind has two things solar lacks: it often blows at night and in the wet season, so it complements solar on the same grid. Its obstacles in Indonesia are data and logistics: few sites have long-term wind measurements, and turbine blades need roads and ports that remote sites lack. A measurement campaign of at least a year is the first step for any serious project.

Sources

  1. Climate Scorecard, Indonesia: the status of solar and wind energy
  2. The Wind Power, Indonesia country statistics
  3. Indonesia Business Post, Ministry reports no wind power investments
  4. Katadata, PLN outlines six renewable projects at COP31, November 2026
  5. TaiyangNews, Indonesia to add 42.6 GW renewables by 2034 under RUPTL

Summaries and analysis by Satu Energy. Programme and plan figures are not operating capacity unless stated.

Download the full report

One energy, limitless solutions.

How can we help?

Send location, capacity and stage. We reply within one working day.

Contact us