JETP Indonesia, three years on

Indonesia’s Just Energy Transition Partnership has grown to about US$21.8 billion in commitments, but about US$3.4 billion had been disbursed by January 2026, and the US has withdrawn. Where the money stands.

Download report (PDF)Download data (CSV)
Illustration for JETP Indonesia, three years on

Key points

  • Commitments grew from US$20 billion to about US$21.8 billion.
  • About US$3.4 billion had been realised by January 2026.
  • The US, which had pledged over US$2 billion, has withdrawn.

Announced in 2022, the Just Energy Transition Partnership (JETP) was meant to finance Indonesia’s move away from coal. Three years in, the headline has grown and the cash has lagged.

JETP in four numbers
  • US$21.4 bnPledged after the December 2025 increase
  • ~US$3.1 bnApproved, about 14.5% (IEEFA)
  • 2.6%Share of the pledge as grants
  • US$97.1 bnInvestment the plan needs, 2023–2030
Source: IEEFA; Climate Home News; Tempo, 2025–2026Download CSVSatu Energy

Commitments and cash

Less than a sixth of the commitment has been realisedJETP Indonesia, US$ billion
Original pledge, 2022 20.0 US$ bn
Commitments, early 2026 21.8 US$ bn
Realised, January 2026 3.4 US$ bn
Public money disbursed, early 2025 1.1 US$ bn

Realised and disbursed figures use different definitions and are not directly comparable.

Source: Government figures via Warta Ekonomi; Dialogue Earth; The Jakarta PostDownload CSVSatu Energy
Show data
MeasureUS$ bn
Original pledge, 202220.0
Commitments, early 202621.8
Realised, January 20263.4
Public money disbursed, early 20251.1

The government reported about US$21.4 billion in commitments and about US$3.4 billion realised by January 2026. A February 2026 signing added roughly US$400 million. In early 2025, only about US$1.1 billion of public money had been disbursed.

The US exit

The United States, which had committed more than US$2 billion, withdrew from its JETP deals with Indonesia, South Africa and Vietnam. Indonesian ministers have said other partners will not follow.

Where it bites

  • Coal retirement. The plan to retire 6.7 GW of coal by 2030 depends on concessional money. The collapse of the Cirebon-1 early retirement shows how hard that is.
  • Grids. Transmission, the cheapest enabler of renewables, is capital-heavy and slow to finance.
  • Private capital. Most JETP finance was always meant to be commercial. It moves when projects are bankable, which is a procurement and tariff question as much as a climate one.

A pledge, not a budget

The pledge covers about a fifth of what the plan needsUSD billion
Investment needed, 2023–2030 (CIPP) 97.1 USD bn
JETP pledge, after December 2025 21.4 USD bn
Approved (IEEFA) 3.1 USD bn
Grants within the pledge (2.6%) 0.56 USD bn
Source: IEEFA; Climate Home News; Satu Energy calculation for grants (2.6% of US$21.4 bn)Download CSVSatu Energy
Show data
MeasureUSD bn
Investment needed, 2023–2030 (CIPP)97.1
JETP pledge, after December 202521.4
Approved (IEEFA)3.1
Grants within the pledge (2.6%)0.56

Most of the pledge is loans and guarantees on commercial or near-commercial terms. That makes JETP useful for bankable projects and much less useful for the things that are hard to finance: early coal retirement, grid in remote systems, and support for workers and regions. The Cirebon-1 cancellation showed the limit. See why Cirebon-1 will not close early.

What to watch

  • Disbursement updates from the JETP secretariat.
  • Whether redirected funds go to grids and storage rather than single plants.
  • How the 100 GWp programme is financed alongside JETP.

Sources

  1. Warta Ekonomi, JETP projects expected to support a sustainable energy future
  2. Dialogue Earth, Indonesia’s captive coal: financing industrial decarbonisation
  3. The Jakarta Post, The broken promise of coal transition finance, June 2026
  4. Mining Weekly, Indonesia coal power phase-out plan at risk due to stalled funding
  5. IEEFA, building credibility in Indonesia’s energy transition
  6. Climate Home News, Indonesia’s failing JETP is a cautionary tale

Summaries and analysis by Satu Energy. Programme and plan figures are not operating capacity unless stated.