Indonesia trails its neighbours on solar

Wind and solar supply about 13% of Vietnam’s electricity and about 4% in Thailand and the Philippines. In Indonesia it was 0.5% in 2024. Why the gap is so wide, and what Indonesia can learn from the countries ahead of it.

Download report (PDF)Download data (CSV)
Illustration for Indonesia trails its neighbours on solar

Key points

  • Wind and solar supply about 13% of Vietnam’s electricity, and about 4% in Thailand and the Philippines.
  • Indonesia’s wind and solar share was 0.5% in 2024, against 15% worldwide.
  • Vietnam’s lead came from fast, simple procurement; its curtailment problems came from grids that lagged.

Indonesia has the largest population, the largest economy and one of the best solar resources in Southeast Asia. On the share of electricity from wind and solar, it ranks near the bottom.

The comparison

Vietnam gets 26 times Indonesia’s share from wind and solarWind and solar share of electricity generation, %
Asia, 2025 17.0 %
World, 2024 15.0 %
Vietnam 13.0 %
Cambodia 6.0 %
Thailand 4.0 %
Philippines 4.0 %
Indonesia, 2024 0.5 %

Country shares from the IEA are rounded and refer to the latest year in its outlook.

Source: IEA Southeast Asia Energy Outlook 2026 (Vietnam, Cambodia, Thailand, Philippines, approximate); Ember (Indonesia, World, Asia)Download CSVSatu Energy
Show data
Country or region%
Asia, 202517.0
World, 202415.0
Vietnam13.0
Cambodia6.0
Thailand4.0
Philippines4.0
Indonesia, 20240.5
Indonesia’s power mix in brief
  • 18%Clean share of electricity, 2024, mostly hydro and geothermal
  • 0.5%Wind and solar share, 2024
  • 5thIndonesia’s rank among the world’s coal power generators
Source: Ember, Indonesia profileDownload CSVSatu Energy

Why Vietnam pulled ahead

Vietnam’s solar boom came from a simple, generous feed-in tariff that let developers build quickly without competitive tenders. Thousands of megawatts were added in a short burst. It also produced the lesson that matters most for Indonesia: the grid could not keep up, and plants in the best-irradiated provinces were curtailed. Vietnam then paused new procurement while it rebuilt rules and transmission.

Three things transfer to Indonesia:

  1. Simple procurement unlocks volume. Standardised contracts and predictable tenders bring capital in faster than bespoke negotiations.
  2. Grid timing decides value. Solar built faster than transmission gets curtailed. Indonesia’s Green Enabling Super Grid plan and storage need to move with solar tenders, not after them.
  3. Rooftops matter. A large share of Vietnam’s solar was on roofs, close to load, where it needed little new transmission.

Why Indonesia is behind

  • Cheap, contracted coal. The USD 70 coal cap and take-or-pay contracts made new solar look expensive and hard to dispatch.
  • Small, slow tenders until the 2025–2034 RUPTL.
  • Local-content rules that raised costs before domestic manufacturing was ready.
  • Rooftop rules that removed export credit in 2024 and introduced quotas.

What could close the gap

Starting from 0.5%, the arithmetic is favourable: every gigawatt of solar adds roughly 1.3–1.4 TWh a year, a visible step in the national share. The 100 GWp programme, Mentari Nusantara tenders and village cooperative solar are, in combination, large enough to move Indonesia into the regional pack within a few years, if they are built with the grid and storage to use the output.

What to watch

  • Indonesia’s 2025 and 2026 wind and solar shares when Ember updates its data.
  • Award volumes under Mentari Nusantara.
  • Curtailment rates as the first large solar clusters come online.

Sources

  1. IEA, Southeast Asia Energy Outlook 2026
  2. Ember, Indonesia country profile
  3. Ember, Global Electricity Review 2026
  4. Ember, Asia region
  5. Ember, unleashing solar and wind in ASEAN, 2022

Summaries and analysis by Satu Energy. Programme and plan figures are not operating capacity unless stated.