Cirata and the case for floating solar

Cirata, a 192 MWp floating plant on a West Java hydro reservoir, has run since 2023. Its owners are studying expansion to 500 MW and then 1,000 MW, and five more reservoirs sit in the 100 GWp programme. What Cirata teaches.

Download report (PDF)Download data (CSV)
Illustration for Cirata and the case for floating solar

Key points

  • Cirata has 192 MWp (145 MWac) of floating solar, operating since November 2023.
  • Its owners are studying 500 MW and then 1,000 MW, targeted for the early 2030s.
  • Floating sites share the hydro plant’s grid connection, the scarcest asset in solar.

Cirata, on a hydropower reservoir in West Java, is Indonesia’s reference project for floating solar. It is owned by PLN Nusantara Renewables (51%) and Masdar (49%) and sells its power to PLN.

Cirata in three numbers
  • 192 MWpFloating solar operating since November 2023
  • 145 MWacGrid-side capacity
  • 1,000 MWLong-term expansion studied
Source: Sources listed belowDownload CSVSatu Energy

The plant and its plans

Cirata could grow fivefold from today’s plantCirata floating solar, MW
Operating, AC 145 MW
Operating, DC (MWp) 192 MW
Expansion study, stage 1 500 MW
Expansion plan, stage 2 1,000 MW

Expansion figures are studies and plans, not approved projects; sources differ on MWac or MWp.

Source: PV Tech, Katadata and Listrik Indonesia, 2023–2026Download CSVSatu Energy
Show data
StageMW
Operating, AC145
Operating, DC (MWp)192
Expansion study, stage 1500
Expansion plan, stage 21,000

Cirata has 192 MWp (145 MWac) in operation since November 2023. Its owners signed a study agreement for up to 500 MW and the operator has said it is preparing 1,000 MW in a second stage, with operation targeted in the early 2030s.

Why reservoirs work

  • The grid is already there. A hydro plant has a substation and transmission sized for its output. Solar can share it, especially when hydro runs less at midday.
  • No land acquisition. Water surface avoids the slowest part of ground-mounted projects.
  • Cooler panels. Water keeps modules cooler, which raises output modestly.
  • Hybrid operation. Hydro can hold water during sunny hours and generate after sunset, acting like storage.

What is harder

  • Mooring and anchoring in reservoirs with large water-level swings.
  • Coverage limits set by water, fisheries and environmental rules.
  • Coordination with the reservoir operator over dispatch and access.

The pipeline

At least five of the fourteen launch sites in the 100 GWp programme are reservoirs: Saguling, Cirata, Jatiluhur, Jatigede and Gajah Mungkur (134 MWp). Three floating projects are also on the list of six ready for tender. Cirata’s operating data is the best evidence those bids will have.

The tariff gap for floating solar

Floating plants are central to Java’s solar plans: Cirata, Saguling, Jatiluhur, Jatigede and Gajah Mungkur all appear in the 100 GWp programme. Yet IESR notes that Presidential Regulation 112/2022 still has no clear tariff provision for floating solar. Floating structures, anchoring and marine-grade cabling cost more than ground mounts, and a ceiling designed for land-based plants does not reflect that.

Cirata’s expansion would be five times today’s plantCirata floating solar, MW
02505007501,000
145Today (AC)
500First expansion
1,000Long term
Source: Sources listed belowDownload CSVSatu Energy
Show data
StageMW
Today (AC)145
First expansion500
Long term1,000

Until a floating tariff exists, expansions like Cirata’s depend on negotiated terms with PLN, which slows replication across reservoirs.

Sources

  1. PV Tech, Masdar and PLN inaugurate 192 MWp floating PV site
  2. Katadata, PLN and Masdar study expanding Cirata to 500 MWac
  3. Listrik Indonesia, PMSE prepares Cirata 1,000 MW for the 100 GW programme
  4. Cabinet Secretariat of Indonesia, launch of the 100 GWp solar programme
  5. IESR, solutions to accelerate renewable energy procurement in Indonesia

Summaries and analysis by Satu Energy. Programme and plan figures are not operating capacity unless stated.