AnalysisPolicy

The USD 70 coal cap and who pays for it

Since 2018, coal for PLN has been capped at USD 70 a tonne. In 2026 that cap collided with a supply shortfall, rolling blackouts and a plan to cut output. How the domestic market obligation works and what it means for renewables.

Download report (PDF)Download data (CSV)
Illustration for The USD 70 coal cap and who pays for it

Key points

  • Coal for public power has been capped at USD 70 a tonne since 2018; cement and fertiliser pay up to USD 90.
  • Miners must sell 25% of output at home; the government has discussed raising that above 30%.
  • PLN faced a coal shortfall of about 20 million tonnes in 2026, part of the backdrop to June’s rolling blackouts.

Indonesia is one of the world’s largest coal exporters, yet in 2026 its state utility could not secure enough coal to keep Java’s plants at full output. The reason is a policy built for a different market: the domestic market obligation (DMO) and its USD 70 per tonne price cap.

How the DMO works

Two rules sit together:

  • Volume. Coal miners must sell 25% of their output in the domestic market.
  • Price. Coal sold for public power generation is capped at USD 70 a tonne, a rule in place since 2018. Selected industries such as cement and fertiliser face a ceiling of USD 90.

When the government’s reference price (the HBA, now based on average selling prices in the previous two months) falls below the cap, domestic buyers pay the HBA. When export prices climb above the cap, the gap becomes a subsidy from miners to PLN, and to every PLN customer whose tariff has not changed since 2017.

PLN pays the lowest regulated coal pricePrice ceilings for domestic coal, USD per tonne
Public power (PLN and IPPs) 70 USD/t
Cement and fertiliser 90 USD/t
Source: Indonesia Investments; Ministry of Energy and Mineral Resources regulationsDownload CSVSatu Energy
Show data
BuyerUSD/t
Public power (PLN and IPPs)70
Cement and fertiliser90

Why the cap stopped working in 2026

A cap only works if miners keep selling. Trend Asia described the widening gap between market prices and the DMO price as making PLN the least attractive buyer. Miners could still meet their 25% obligation by selling to captive power plants, the off-grid plants at smelters and industrial parks, at uncapped prices. In 2026 the government closed that route: coal sold to off-grid plants no longer counts towards the DMO.

The shortfall was still large. IEEFA put PLN’s 2026 gap at about 20 million tonnes. Asia Times reported a need of around 154 million tonnes against about 134 million tonnes under binding contracts. In June, rolling blackouts hit Java, and the energy minister said restricted coal supply had left plants below capacity.

At 600 Mt of output, each five points of DMO moves 30 MtDomestic coal volume at different DMO shares, if national output is 600 million tonnes
0100200300
15025%
18030%
21035%

Illustrative arithmetic. The DMO covers all domestic buyers, not only PLN, whose 2026 need was reported at about 154 Mt.

Source: Satu Energy calculation from the reported 600 Mt output plan and DMO shares under discussion (Jakarta Globe)Download CSVSatu Energy
Show data
DMO shareMt
25%150
30%180
35%210

The options on the table

In 2026 the government discussed three levers:

  1. A higher DMO share, above 30%.
  2. A production cut to about 600 million tonnes, to support prices.
  3. A review of the USD 70 price after producers said it no longer covers rising mining costs. The energy minister said in June he would review it.

Each lever moves cost around rather than removing it. Raising the cap raises PLN’s fuel bill, which flows into subsidy and compensation payments from the state budget. Raising the DMO share pushes more low-price tonnes onto miners. Cutting output tightens supply.

What it means for renewables

The DMO hides the true cost of coal power. PLN’s generation cost from coal reflects USD 70 coal, not market coal, so new solar and wind are compared against a subsidised benchmark. That shapes tariff ceilings, procurement and how quickly renewable PPAs are signed.

The 2026 shortfall shows the other side: a cheap fuel is worth little if it does not arrive. Domestic renewables have no fuel logistics, no DMO and no export-price exposure. For a utility that rationed power in June, that is an energy-security argument as much as a climate one.

What to watch

  • The outcome of the DMO price review and any change to the 25% share.
  • Whether PLN publishes coal stock days by plant.
  • The 2027 production quota (RKAB) and how it treats PLN supply.

Sources

  1. Indonesia Investments, coal price capped at USD 70 per ton
  2. Jakarta Globe, Indonesia weighs raising coal DMO above 30%
  3. MINING.COM, coal sold to off-grid power plants no longer subject to DMO
  4. Trend Asia, off-grid power plants no longer count towards DMO
  5. IEEFA, strengthening Indonesia’s energy security by reducing coal dependence
  6. Asia Times, why coal-rich Indonesia can’t keep the lights on, July 2026

Summaries and analysis by Satu Energy. Programme and plan figures are not operating capacity unless stated.

Download the full report

One energy, limitless solutions.

How can we help?

Send location, capacity and stage. We reply within one working day.