How a company buys green power in Indonesia
Without power wheeling, companies in Indonesia have four ways to buy renewable electricity. A comparison of PLN certificates, rooftop solar, captive plants and green tariffs on cost, additionality and effort, with 2026 numbers.
Key points
- PLN certificates cost Rp 35,000 per MWh, about 3% on top of the I-3 tariff, but add no new capacity.
- Rooftop solar in our worked example costs about Rp 879 per kWh, below the grid tariff it replaces.
- The 2026 rooftop quota is about 1,065 MW nationally, with a proposed 400 MW increase.
Global companies operating in Indonesia increasingly need to report the source of the electricity they use, and many have committed to 100% renewable power. Indonesia does not allow them to sign a contract with a renewable generator and have PLN deliver the power (power wheeling), and the government has said it will not. That leaves four routes.
The four routes, compared
| Route | What you get | Adds new capacity? | Effort |
|---|---|---|---|
| PLN renewable energy certificates (REC) | A claim on 1 MWh of renewable output per certificate | Rarely; mostly existing hydro and geothermal | Low |
| Rooftop or on-site solar | Your own generation, behind the meter | Yes | Medium |
| Captive renewables in an industrial park | Power from a plant in the park’s own network | Yes | High |
| PLN green tariff products | Supply linked to specific renewable plants | Depends on the product | Low |
What each costs per kWh
The certificate premium is small: Rp 35,000 per MWh is Rp 35 per kWh, about 3% on the I-3 tariff. Rooftop solar in our worked example, levelised over 25 years, costs about Rp 879 per kWh, below the grid tariff it displaces. It only covers daytime hours, and roof area usually limits it to part of a factory’s consumption.
Certificates: easy, growing, and limited
PLN’s certificate sales grew from about 0.3 TWh in 2021 to 5.4 TWh in 2024. They are a legitimate way to claim renewable use under most reporting standards. Their limit is additionality: buying a certificate from a hydro plant built decades ago does not add any new clean power. Sustainability teams increasingly separate the two in reporting.
Rooftop: the quota is the constraint
Rooftop systems need a slot in PLN’s yearly quota for the grid they connect to.
In January 2026 the ministry proposed adding 400 MW to the 2026 quota.
Show data
| Year | MW |
|---|---|
| 2024 | 901 |
| 2025 | 1,004 |
| 2026 | 1,065 |
| 2027 | 1,183 |
| 2028 | 1,593 |
Since 2024, exported energy earns no credit, so a system should be sized to what the site uses during the day. A month of interval metering tells you that number.
A practical sequence
- Measure consumption by hour, by meter.
- Install rooftop or on-site solar sized to daytime self-consumption. It is the only route that lowers cost and adds capacity.
- Cover the remainder with certificates while better options develop.
- Ask for additionality when PLN offers green tariff products tied to new plants.
- Report honestly: separate on-site generation from certificate claims.
What to watch
- PLN green tariff products tied to new solar or wind.
- Any network-rental scheme under the Electricity Law.
- Whether the 2026 rooftop quota increase is approved.
Sources
- Tempo, what is a green certificate or renewable energy certificate
- Invest Indonesia, PLN renewable energy certificate sales up 14% in 2025
- The Jakarta Post, Indonesia seeks to boost rooftop solar quota by 400 MW
- pv magazine, Indonesia targets over 5.7 GW of rooftop solar by 2028
- Metro TV, electricity tariffs as of 31 August 2026
- Bloomberg Technoz, ESDM confirms power wheeling is not in RUU EBET
Summaries and analysis by Satu Energy. Programme and plan figures are not operating capacity unless stated.
Satu Energy (PT Satu Solusi Energi), Jakarta. Read online and download the chart data at satuenergy.com/insights/corporate-green-power-indonesia/. Contact: contact@satuenergy.com. This report uses public sources only; figures for plans and programmes are not operating capacity unless stated.