Danantara’s waste-to-energy push, city by city

Indonesia’s sovereign fund Danantara is tendering waste-to-energy plants under Perpres 109/2025. Three locations have winners, nine more are in the next wave and 25 are planned. What has been awarded, who is winning and what makes these plants bankable.

Download report (PDF)Download data (CSV)
Illustration for Danantara’s waste-to-energy push, city by city

Key points

  • The first tender drew 24 companies; nine submitted proposals and three locations have named winners.
  • Chinese firms dominated, with Zhejiang Weiming taking Greater Denpasar and Greater Bogor.
  • The plan covers 25 locations serving 62 cities and districts with waste emergencies.

Indonesia’s cities are running out of landfill. The government’s answer is a national programme of waste-to-energy plants (pengolahan sampah menjadi energi listrik, PSEL), procured by the sovereign wealth fund Danantara under Presidential Regulation 109/2025. In 2026 it moved from announcement to awards.

The programme in 2026
  • 24 → 9Companies in the first tender, and proposals submitted
  • 3Locations with named winners: Greater Denpasar, Bekasi City, Greater Bogor
  • 25Locations planned, covering 62 cities and districts
Source: Indonesia Business Post; Jakarta Globe; ANTARA, 2026Download CSVSatu Energy

From 24 bidders to three awards

Danantara opened the first tender in November 2025. Twenty-four companies joined the process; only nine submitted proposals. The original list of seven cities was narrowed to four for the first round, and in early March 2026 winners were announced for three: Greater Denpasar, Bekasi City and Greater Bogor. Chinese companies dominated the shortlist, and Zhejiang Weiming Environment Protection won both Denpasar and Bogor.

Most first-round bidders dropped out before proposalsFirst-wave waste-to-energy tender, number of companies
Joined the tender process 24
Submitted proposals 9 38%
Source: Indonesia Business Post, 2026Download CSVSatu Energy
Show data
StageValue
Joined the tender process24
Submitted proposals9

A drop from 24 to nine is not unusual for a first tender of a new asset class. It does say something about how bidders read the risk: the companies that stayed are those with waste-to-energy plants already running at home, which in practice means China.

The pipeline behind the first wave

The pipeline grows in wavesLocations at each stage of the PSEL programme, 2026
0102030
3Wave 1 awarded
9Wave 2 tender
6MoUs, May 2026
25Planned in total

Stages overlap: some MoU locations, such as Bekasi and Bogor-Depok, also appear in tender waves.

Source: Jakarta Globe; ANTARA; Indonesia Business Post, 2026Download CSVSatu Energy
Show data
StageValue
Wave 1 awarded3
Wave 2 tender9
MoUs, May 20266
Planned in total25
  • Second wave. A next round covering nine more cities was opened to national and foreign firms, with winners expected around mid-2026.
  • Regional agreements. In May 2026 Danantara signed memoranda with regional governments for six locations: Lampung, Serang, Medan, Semarang, Bogor-Depok and Bekasi.
  • Partner list. In March 2026 Danantara opened registration for a verified partner list (DPT), which will shortlist bidders for later rounds.

What makes a waste-to-energy plant bankable

A waste plant earns from two sources: a tipping fee paid by the city for each tonne it takes, and electricity sales, in Indonesia to PLN. The engineering is mature. The risks are commercial:

  1. Waste supply and quality. Indonesian municipal waste is wet and organic-heavy, which lowers its heating value. A plant sized on the wrong waste data under-produces for its whole life. Sampling over wet and dry seasons is essential.
  2. Who pays the tipping fee. Regional budgets vary widely. A national guarantee or a fund backed by Danantara changes the credit risk completely.
  3. Grid connection. Most plants will sit at the edge of cities on the 20 kV or 150 kV network. Connection capacity and PLN’s offtake terms decide whether power can be sold.
  4. Emissions control. Flue-gas treatment is a large part of the capital cost and the part most likely to face public scrutiny.

What it means for engineering firms

The awards so far have gone to vertically integrated foreign operators. The local opportunity is in the work around them: waste characterisation studies, grid connection studies and substation design, owner’s engineering for cities and lenders, and long-term monitoring of output against guaranteed performance.

What to watch

  • Second-wave winners and whether any Indonesian firm leads a consortium.
  • The tipping-fee level and electricity tariff set under Perpres 109/2025.
  • Construction starts at the first three sites; Danantara had targeted early 2026 for the first plants.

Sources

  1. ANTARA, Danantara signs deals for six waste-to-energy projects
  2. Indonesia Business Post, Danantara to announce first-wave tender winners in March
  3. Indonesia Business Post, 24 foreign firms shortlisted for the first wave
  4. Jakarta Globe, Indonesia opens next waste-to-energy tender after China landslide win
  5. SUPRA International, Indonesia’s waste-to-energy update: Danantara’s tender process
  6. Malay Mail, Danantara opens DPT registration for PSEL partners, 19 March 2026

Summaries and analysis by Satu Energy. Programme and plan figures are not operating capacity unless stated.