Indonesia’s nickel smelters used 81 TWh of captive power in 2025, over 90% of it from coal. Buyers want lower-carbon nickel. What it would take to replace smelter coal with solar and storage, and where it is already starting.
Key points
- Captive coal generated about 134 TWh in 2025, equal to 58% of on-grid coal, up from 50% in 2024.
- The nickel sector alone used over 81 TWh of captive power, more than 90% from coal.
- Pulp and paper used 70 GWh of captive solar in 2025, showing the model works at small scale.
Indonesia built the world’s largest nickel processing industry in a decade, and powered most of it with coal plants built inside the industrial parks. These captive plants sit outside PLN’s grid and outside its plans. As battery makers and carmakers start to ask what their nickel emits, captive coal has become the industry’s biggest commercial risk.
How big captive coal has become
Ember’s new estimate puts captive coal generation at about 134 TWh in 2025, equal to 58% of the 233 TWh generated by grid-connected coal plants. A year earlier the ratio was 50%.
Show data
| Year | % |
|---|---|
| 2024 | 50 |
| 2025 | 58 |
The nickel sector alone used more than 81 TWh of captive power in 2025, with over 90% from coal. For comparison, the national electricity plan (RUKN) puts total consumption in 2025 at about 539 TWh, so nickel’s captive use alone is equal to about 15% of it.
Where it is concentrated
CREA and GEM link the Indonesia Weda Bay Industrial Park in North Maluku to about 4.54 GW of operating captive coal capacity, the largest single driver of captive growth. The Indonesia Morowali Industrial Park (IMIP) in Central Sulawesi began renewable work with a feasibility study in 2022 and stated a plan to integrate 506 MWp of solar by 2026. Whether that target was met has not been confirmed.
Why solar alone cannot run a smelter
A rotary-kiln electric-furnace smelter runs around the clock at nearly constant load. Solar in Indonesia has a capacity factor of roughly 15–17%: over a year it delivers the equivalent of running at full output for about one hour in six. Replacing coal therefore needs one of:
- Solar plus large batteries, with enough storage to carry the night. Ember’s policy paper suggests solar-plus-storage microgrids as the comparison case for hubs such as Morowali and Weda Bay.
- Hydro or geothermal, firm but site-specific, and far from most smelters.
- A grid connection to a PLN system with a cleaner mix, which most remote smelter parks lack.
In practice the first step is partial: solar covering daytime auxiliary and process load, cutting coal burn by a fraction while coal units stay online for the base. Pulp and paper has shown that: the sector used 70 GWh of captive solar in 2025.
The commercial pressure
Buyers of battery-grade nickel increasingly ask for a product carbon footprint. Nickel from coal-powered smelters scores poorly against producers using hydro. A smelter that can document lower-carbon power, metered and auditable, has a pricing advantage. That is a data problem as much as an engineering one: the electricity mix behind each tonne must be measured, not estimated.
Policy is catching up
Two signals from 2026: coal sold to captive plants no longer counts towards miners’ domestic market obligation, which removes a quiet advantage captive buyers had. And the government has discussed a moratorium on new smelters producing semi-processed products, which would slow captive growth.
What it means for engineering firms
- Hybrid design is the core skill. Sizing solar, storage and coal turndown together, without destabilising a process load, needs detailed modelling of the smelter’s load profile.
- Measurement first. Interval metering of each process area tells you what solar can actually displace.
- Carbon accounting second. Product footprint claims need monitoring systems that hold up to audit.
What to watch
- Commissioning of IMIP’s planned solar capacity.
- Any national rule bringing captive plants into the RUPTL or emissions reporting.
- Contract terms from battery makers requiring documented power sources.
Sources
- Ember, Indonesia’s captive coal giant: better data to shape industrial competitiveness
- Ember, Indonesia’s captive coal generation is equivalent to more than 50% of on-grid coal generation
- Ember, from captive coal to green nickel: securing Indonesia’s future competitiveness
- CREA and GEM, Indonesia captive coal in 2025
- CREA and GEM, Indonesia captive power 2024
- SUPRA International, RUKN 2025–2060 national electricity plan
- Brief Asia, Indonesia’s off-grid coal plants bypass national energy transition targets
Summaries and analysis by Satu Energy. Programme and plan figures are not operating capacity unless stated.
Satu Energy (PT Satu Solusi Energi), Jakarta. Read online and download the chart data at satuenergy.com/insights/green-nickel-captive-solar/. Contact: contact@satuenergy.com. This report uses public sources only; figures for plans and programmes are not operating capacity unless stated.