Borneo’s big dams and the green industrial park
The 1,375 MW Mentarang Induk hydropower project in North Kalimantan is meant to power a green industrial park for batteries and aluminium. Its cost, ownership, timeline and the forest it will flood.
Key points
- Mentarang Induk is a 1,375 MW, USD 2.6 billion hydropower project that broke ground in March 2023.
- It is meant to supply the Kalimantan green industrial park (KIHI) for batteries, aluminium and petrochemicals.
- The reservoir will flood about 2.4 km² of Kayan Mentarang National Park, according to critics.
Most of Indonesia’s clean-power debate is about solar. In North Kalimantan, the bet is on rivers. The Mentarang Induk hydropower project, 1,375 MW in Malinau regency, is designed to power a new green industrial park where batteries, aluminium and petrochemicals would be made with low-carbon electricity.
The project
- 1,375 MWPlanned capacity
- USD 2.6 bnReported project cost
- USD 1.9 mCost per MW (Satu Energy calculation)
President Joko Widodo launched construction on 1 March 2023. The developer, PT Kayan Hydropower Nusantara, targeted financial close by the first quarter of 2026; confirmation of the close was not found in public sources.
- Alamtri Resources (formerly Adaro)
- Sarawak Energy
- Kayan Patria Pratama
Show data
| Item | Alamtri Resources (formerly Adaro) | Sarawak Energy | Kayan Patria Pratama |
|---|---|---|---|
| Shareholding | 50 | 25 | 25 |
Why hydro for industry
A smelter or a battery-materials plant needs power around the clock. Solar alone cannot provide that without very large batteries. A reservoir hydro plant can: it stores energy as water and dispatches it on demand. That is why the government paired Mentarang, and the much larger Kayan cascade planned on the same river system, with the Kalimantan green industrial park (KIHI).
The trade-offs
A January 2026 briefing by the Nugal Institute and the World Rainforest Movement said the project was at an advanced stage of construction and that its reservoir will flood about 2.4 km² of Kayan Mentarang National Park, in the Heart of Borneo. Indigenous communities and conservation groups have raised concerns about forest loss, river ecology and resettlement.
These are real costs, and they bear on the product’s value. A battery maker buying “green” aluminium or nickel from KIHI will be asked about the power source’s environmental and social record, not just its carbon intensity.
What it means
- For industry: firm, low-carbon power at scale is rare in Indonesia. If KIHI delivers it, products made there could carry a credible low-carbon claim.
- For the grid: large hydro in North Kalimantan could later export power to the Kalimantan system and the planned Kalimantan–Tarakan corridor.
- For engineering: hydro projects of this size need long-term hydrological monitoring, sediment management and dispatch planning integrated with the industrial load they serve.
What to watch
- Confirmation of financial close and the construction schedule.
- Tenants signing up for KIHI and their power contracts.
- Environmental and social safeguards reporting by lenders.
Sources
- Wikipedia, Mentarang Induk Hydroelectric Power Plant
- Petromindo, Kayan Hydropower targets Q1 2026 financial close
- VietnamPlus, construction begins on USD 2.6 billion hydropower plant in Indonesia
- Enerdata, Indonesia launches construction of 1.4 GW hydro project in Borneo
- World Rainforest Movement, the Mentarang-Kalimantan hydropower dam: electricity for whom?
- Eco-Business, Indonesia’s hydropower projects threaten Indigenous forests in the Heart of Borneo
Summaries and analysis by Satu Energy. Programme and plan figures are not operating capacity unless stated.
Satu Energy (PT Satu Solusi Energi), Jakarta. Read online and download the chart data at satuenergy.com/insights/mentarang-kayan-hydropower/. Contact: contact@satuenergy.com. This report uses public sources only; figures for plans and programmes are not operating capacity unless stated.