ReportIndustry

Borneo’s big dams and the green industrial park

The 1,375 MW Mentarang Induk hydropower project in North Kalimantan is meant to power a green industrial park for batteries and aluminium. Its cost, ownership, timeline and the forest it will flood.

Download report (PDF)Download data (CSV)
Illustration for Borneo’s big dams and the green industrial park

Key points

  • Mentarang Induk is a 1,375 MW, USD 2.6 billion hydropower project that broke ground in March 2023.
  • It is meant to supply the Kalimantan green industrial park (KIHI) for batteries, aluminium and petrochemicals.
  • The reservoir will flood about 2.4 km² of Kayan Mentarang National Park, according to critics.

Most of Indonesia’s clean-power debate is about solar. In North Kalimantan, the bet is on rivers. The Mentarang Induk hydropower project, 1,375 MW in Malinau regency, is designed to power a new green industrial park where batteries, aluminium and petrochemicals would be made with low-carbon electricity.

The project

Mentarang Induk at a glance
  • 1,375 MWPlanned capacity
  • USD 2.6 bnReported project cost
  • USD 1.9 mCost per MW (Satu Energy calculation)
Source: VietnamPlus; Enerdata, 2023Download CSVSatu Energy

President Joko Widodo launched construction on 1 March 2023. The developer, PT Kayan Hydropower Nusantara, targeted financial close by the first quarter of 2026; confirmation of the close was not found in public sources.

A coal miner turned power developer holds halfOwnership of the Mentarang Induk developer, %
  • Alamtri Resources (formerly Adaro)
  • Sarawak Energy
  • Kayan Patria Pratama
Shareholding50%25%25%
Source: Wikipedia, citing company disclosuresDownload CSVSatu Energy
Show data
ItemAlamtri Resources (formerly Adaro)Sarawak EnergyKayan Patria Pratama
Shareholding502525

Why hydro for industry

A smelter or a battery-materials plant needs power around the clock. Solar alone cannot provide that without very large batteries. A reservoir hydro plant can: it stores energy as water and dispatches it on demand. That is why the government paired Mentarang, and the much larger Kayan cascade planned on the same river system, with the Kalimantan green industrial park (KIHI).

Mentarang is the first step of a far larger cascadePlanned hydropower in North Kalimantan, MW
Kayan cascade, estimated 9,000 MW
Mentarang Induk 1,375 MW

The Kayan cascade figure is an estimate reported in secondary sources.

Source: Wikipedia; World Rainforest Movement briefing, January 2026Download CSVSatu Energy
Show data
ProjectMW
Kayan cascade, estimated9,000
Mentarang Induk1,375

The trade-offs

A January 2026 briefing by the Nugal Institute and the World Rainforest Movement said the project was at an advanced stage of construction and that its reservoir will flood about 2.4 km² of Kayan Mentarang National Park, in the Heart of Borneo. Indigenous communities and conservation groups have raised concerns about forest loss, river ecology and resettlement.

These are real costs, and they bear on the product’s value. A battery maker buying “green” aluminium or nickel from KIHI will be asked about the power source’s environmental and social record, not just its carbon intensity.

What it means

  • For industry: firm, low-carbon power at scale is rare in Indonesia. If KIHI delivers it, products made there could carry a credible low-carbon claim.
  • For the grid: large hydro in North Kalimantan could later export power to the Kalimantan system and the planned Kalimantan–Tarakan corridor.
  • For engineering: hydro projects of this size need long-term hydrological monitoring, sediment management and dispatch planning integrated with the industrial load they serve.

What to watch

  • Confirmation of financial close and the construction schedule.
  • Tenants signing up for KIHI and their power contracts.
  • Environmental and social safeguards reporting by lenders.

Sources

  1. Wikipedia, Mentarang Induk Hydroelectric Power Plant
  2. Petromindo, Kayan Hydropower targets Q1 2026 financial close
  3. VietnamPlus, construction begins on USD 2.6 billion hydropower plant in Indonesia
  4. Enerdata, Indonesia launches construction of 1.4 GW hydro project in Borneo
  5. World Rainforest Movement, the Mentarang-Kalimantan hydropower dam: electricity for whom?
  6. Eco-Business, Indonesia’s hydropower projects threaten Indigenous forests in the Heart of Borneo

Summaries and analysis by Satu Energy. Programme and plan figures are not operating capacity unless stated.

Download the full report

One energy, limitless solutions.

How can we help?

Send location, capacity and stage. We reply within one working day.

Contact us