US duties close a door for Indonesian solar

In September 2026 the US finalised antidumping and countervailing duties on solar cells from Indonesia, India and Laos, with combined rates for Indonesia from about 168% to 268%. What it means for Indonesia’s export-built factories and for module prices at home.

Download report (PDF)Download data (CSV)
Illustration for US duties close a door for Indonesian solar

Key points

  • The US set a 94.36% antidumping margin on Indonesian cells, plus countervailing rates from 73.20% to 173.70%.
  • About 4.3 GW of Indonesia’s 10.9 GW module capacity was built with exports in mind.
  • Domestic demand of 1.5–1.9 GW a year is far below capacity, unless the 100 GW programme delivers.

Over the past few years, solar manufacturers moved cell and module lines to Indonesia, partly to serve a US market that had placed duties on products from China and then from other Southeast Asian countries. On 11 September 2026, the US Department of Commerce issued final antidumping and countervailing duty determinations on crystalline silicon cells from India, Indonesia and Laos. For Indonesia, the export route to the US is now effectively closed.

The rates

For Indonesia, Commerce set a final antidumping margin of 94.36%, up sharply from the preliminary figure. Countervailing (anti-subsidy) rates range from 73.20% for PT REC Solar Energy Indonesia and all other companies to 173.70% for PT Blue Sky Solar Indonesia. The two duties stack.

Indonesian cells face combined duties of 168% or moreFinal US duty rates on crystalline silicon solar cells, September 2026, %
Indonesia, Blue Sky Solar (AD + CVD) 268.06 %
India (AD + CVD) 249.13 %
Indonesia, all others (AD + CVD) 167.56 %
Laos (AD only) 65.43 %

Duty orders take effect only if the US International Trade Commission finds injury; its final vote was scheduled for 14 October 2026.

Source: US Department of Commerce via pv-tech and pv magazine India, September 2026; Indonesian combined rates by Satu Energy (94.36% AD plus each CVD rate)Download CSVSatu Energy
Show data
Country and company%
Indonesia, Blue Sky Solar (AD + CVD)268.06
India (AD + CVD)249.13
Indonesia, all others (AD + CVD)167.56
Laos (AD only)65.43

At rates like these, no Indonesian cell is competitive in the US. The question becomes where the output goes instead.

Capacity built for a market that is gone

The Indonesian Solar Module Manufacturers Association (APAMSI) counts 34 module factories with 10.9 GW a year of capacity, of which about 4.3 GW was geared to exports. Cell capacity is growing too: in early November 2026, Yingfa Ruineng unveiled a 7.5 GW n-type TOPCon cell plant, its first outside China, aimed at Indonesia’s domestic market, Southeast Asia and the Middle East.

Two-fifths of module capacity was built to exportIndonesian solar module manufacturing capacity, GW a year
  • Geared to export
  • Other capacity
Module capacity, 20264.36.610.9 GW
Source: APAMSI via Ecobiz Asia, 2026Download CSVSatu Energy
Show data
ItemGeared to exportOther capacity
Module capacity, 20264.36.6

Domestic demand is the bottleneck

APAMSI estimates that Indonesia’s solar market could grow by about 1.5 to 1.9 GW a year between 2025 and 2034. That is a fraction of capacity.

Factories can make six times what the market buysIndonesian module capacity against projected annual demand, GW
Module manufacturing capacity 10.9 GW
Projected annual demand, high 1.9 GW
Projected annual demand, low 1.5 GW
Source: APAMSI via Ecobiz Asia, 2026Download CSVSatu Energy
Show data
MeasureGW
Module manufacturing capacity10.9
Projected annual demand, high1.9
Projected annual demand, low1.5

The 100 GWp programme is the obvious outlet. If even a fraction of it is procured on schedule, with local-content (TKDN) rules favouring domestic modules, the factories have a market. If tenders slip, Indonesia will have a structural oversupply of modules.

What it means for buyers in Indonesia

  • Module prices should soften. Factories with idle export lines compete harder for domestic orders.
  • Check bankability, not just price. Lenders look at manufacturer track record, warranty backing and test results. New lines need independent factory audits and batch testing.
  • TKDN certificates matter more. For PLN projects, local-content compliance is a gate. Confirm the certificate covers the exact product and that it remains valid through procurement.

What to watch

  • The ITC’s final injury determination and the date duty orders take effect.
  • Whether manufacturers redirect output to the Middle East, India or Europe.
  • Procurement pace under the 100 GWp programme, the single biggest determinant of factory utilisation.

Sources

  1. pv-tech, US finalises AD/CVD duties on solar cell imports from India, Indonesia and Laos
  2. pv magazine India, US finalizes trade duties on solar imports from India, Indonesia and Laos, 14 September 2026
  3. Solar Power World, Commerce confirms dumping of solar cells from India, Indonesia and Laos
  4. Ecobiz Asia, APAMSI: Indonesia’s solar manufacturing capacity reaches 10.9 GW, demand remains the bottleneck
  5. pv magazine, Yingfa Ruineng establishes 7.5 GW PV manufacturing plant in Indonesia, 3 November 2026

Summaries and analysis by Satu Energy. Programme and plan figures are not operating capacity unless stated.