Geothermal: big potential, slow build
Indonesia has about 2.74 GW of geothermal power, second only to the United States, and around 23.7 GW of potential. RUPTL adds 5.2 GW by 2034, which needs a far faster build rate than the past decade.
Key points
- Indonesia had about 2.74 GW of geothermal by September 2025, second to the US.
- Only about 11% of the estimated 24 GW potential has been developed.
- The RUPTL adds 5.2 GW by 2034, roughly double today’s fleet.
Geothermal is the one clean source that runs day and night at high availability, and Indonesia sits on one of the world’s largest resources. Turning that into power has been slow.
- 2,776 MWDeveloped, reported at IIGCE 2026
- 23,202 MWEstimated potential
- 12%Share of the potential developed
- 5,700 MWGovernment target for 2030
Where it stands
Ministry figures put installed geothermal capacity at about 2.74 GW by September 2025, up from 2.64 GW at the end of 2024. That ranks Indonesia second in the world, behind the United States at roughly 3.6 to 3.9 GW depending on the source.
Officials cite 23.74 GW of potential at 368 locations. One analysis estimates only about 11% had been developed by 2024.
The build-rate gap
The RUPTL adds 5.2 GW by 2034, about 520 MW a year. One industry analysis reports about 113 MW added in 2025. We could not verify that figure against ministry data, but even generous estimates of recent additions fall well short of the required pace.
Why it is slow
- Exploration risk. Drilling decides whether a field is commercial; failed wells cost tens of millions of dollars before any revenue.
- Tariffs. Prices must cover that risk to attract developers.
- Location. Many fields lie in forests or remote areas with weak grid access.
Why it matters for solar
Geothermal and hydro supply the steady, clean baseload that makes a high-solar grid easier to run. A geothermal shortfall means more storage or more fossil backup for every GW of solar added under the 100 GWp programme.
What comes online next
Several expansions are targeted for late 2026 and 2027. Dates are developer targets, and some sources disagree.
- 2026
- 2030 target
Show data
| Item | 2026 | 2030 target |
|---|---|---|
| Installed geothermal | 2,776 | 5,700 |
The listed units add a few hundred megawatts. Reaching 5,700 MW by 2030 would need around 700 MW a year, several times the recent pace. Barito Renewables, the largest private operator at 926 MW, expects to pass 1 GW by the end of 2026.
Sources
- CNBC Indonesia, Indonesia has 2.71 GW of geothermal power, September 2025
- Kompas, ESDM targets 5.2 GW of new geothermal in ten years, April 2025
- Petromindo, Big promises, slow progress: Indonesia’s geothermal in 2025
- Pertamina Geothermal Energy, Kaleidoscope 2025
- GCN, Indonesia has tapped less than 12% of its geothermal potential
- ThinkGeoEnergy, groundbreaking of five new geothermal plants
- Barito Renewables, advancing toward 1 GW by 2026
- ANTARA, illuminating the future with geothermal power
- ResearchGate, binary power plant potential in Indonesia’s future geothermal projects, 2026 update
Summaries and analysis by Satu Energy. Programme and plan figures are not operating capacity unless stated.
Satu Energy (PT Satu Solusi Energi), Jakarta. Read online and download the chart data at satuenergy.com/insights/indonesia-geothermal-capacity/. Contact: contact@satuenergy.com. This report uses public sources only; figures for plans and programmes are not operating capacity unless stated.