ReportTechnology

Replacing Indonesia’s diesel islands

PLN plans to replace diesel generators at 741 locations, 2,396 units totalling 1,076 MW, mostly with solar and batteries. Earlier plans counted 2.37 GW. Why diesel is the easiest place for solar to win.

Download report (PDF)Download data (CSV)
Illustration for Replacing Indonesia’s diesel islands

Key points

  • PLN counts 2,396 diesel units, 1,076 MW, at 741 locations to replace.
  • Earlier plans covered 2.37 GW in three routes: renewables, gas and grid extension.
  • Diesel is the costliest power PLN makes, so solar plus batteries wins here first.

Thousands of small diesel generators (PLTD) still power Indonesia’s islands and remote towns. They are expensive, polluting and dependent on fuel shipped by sea. Replacing them is the clearest win for solar and batteries.

The diesel fleet
  • 2,396Diesel units to replace
  • 741Locations
  • 3.21 GWpSolar in the replacement plan
  • 9.03 GWhBatteries in the replacement plan
Source: PLN via Danantara Monitor, 2026Download CSVSatu Energy

How big is the fleet

In April 2026, PLN said it plans to replace 2,396 units with 1,076 MW at 741 locations. Earlier plans, from 2022 to 2023, counted about 5,200 units and 2.37 GW at 2,130 locations. Neither PLN nor reporting explains the gap; part of the fleet has likely been connected to larger grids or converted since.

The earlier plan split diesel exit into three routesDiesel capacity by conversion route in PLN’s earlier plan, MW
Extend the grid to the isolated system 1,070 MW
Convert to gas 598 MW
Replace with renewables 500 MW

The routes add to 2.17 GW of the 2.37 GW fleet counted at the time.

Source: PLN via Kontan Insight, 2022–2023Download CSVSatu Energy
Show data
RouteMW
Extend the grid to the isolated system1,070
Convert to gas598
Replace with renewables500

Why diesel goes first

  • Cost. Diesel is the most expensive electricity PLN produces. On Rengit Island, solar extended supply from about 12 to 24 hours a day and cut the cost of supply by about IDR 4,400/kWh (26%).
  • Scale. Most sites are small, so projects are quick to build.
  • Subsidy. Every litre avoided reduces the state’s compensation bill.

The engineering is in the battery

A diesel island has no larger grid to lean on. Solar must be paired with a battery sized to carry the evening and the night, and with controls that keep frequency stable when clouds pass. The diesel often stays as backup, running far fewer hours. Getting that sizing right, hour by hour across a whole year, is what makes or breaks the economics.

Solar needs almost three hours of storage here

The plan pairs every kW of solar with 2.8 kWh of batteryPLN diesel-replacement plan
Solar, GWp 3.21
Batteries, GWh 9.03

9.03 GWh ÷ 3.21 GWp ≈ 2.8 hours of storage per peak kW.

Source: Danantara Monitor, 2026Download CSVSatu Energy
Show data
ComponentValue
Solar, GWp3.21
Batteries, GWh9.03

That ratio reflects island load: demand peaks in the evening, when solar is gone. A regulation announced in February 2026 would price batteries paired with solar in remote areas against local diesel cost, with a focus on projects under 10 MW. It is the first Indonesian rule to value storage by what it replaces. More in Indonesia’s battery market.

What to watch

  • The first tenders for the PLTD-to-solar packages and their bundle sizes.
  • Monitoring data from converted sites: diesel hours avoided, battery cycling.
  • Whether island projects in the 100 GWp programme become a template.

Sources

  1. Kontan, Solar and BESS to anchor PLN’s RUPTL and dedieselisation, April 2026
  2. CNBC Indonesia, Indonesia to retire oil-fired plants and replace them with solar, March 2026
  3. Kontan Insight, PLN prepares three diesel conversion schemes
  4. Ministry of Energy and Mineral Resources, Rengit Island, August 2026
  5. Danantara Monitor, PLN to swap 2,396 diesel plants with 3.21 GWp of solar and 9.03 GWh of BESS
  6. ESS News, regulation to encourage BESS and hydrogen in remote locations

Summaries and analysis by Satu Energy. Programme and plan figures are not operating capacity unless stated.