Captive coal, Indonesia’s second power system
Off-grid coal plants built for industry reached 19.3 GW in 2025, with 31 GW operating, under construction or planned. Captive coal made up about 80% of new coal additions in a year. What it means for emissions and for solar.
Key points
- Captive coal reached 19.3 GW operating in 2025, with 31 GW in total including plans.
- It made up about 80% of Indonesia’s new coal additions between mid-2024 and mid-2025.
- Captive coal generated about 134 TWh in 2025, 58% as much as on-grid coal.
Most debate about Indonesia’s coal fleet is about PLN’s grid. A second fleet, built by industry for its own use, is growing faster.
- 19.3 GWOperating in 2025
- 31 GWIncluding plants in the pipeline
- ~80%Share of new coal additions, mid-2024 to mid-2025
- 134 TWhGenerated in 2025
The pipeline
CREA and Global Energy Monitor count 19.3 GW of captive coal in operation, 3.6 GW under construction and 8.16 GW in planning: about 31 GW in total.
Between July 2024 and July 2025, captive plants made up about 80% of all new coal capacity in Indonesia, with 4.49 GW marked operational. CREA links the new additions in Central Sulawesi and North Maluku to the nickel industry. A July 2026 follow-up finds a similar pattern starting in aluminium, with 9.8 GW of captive coal linked to it.
The generation
Why it matters
- Targets. Retirement plans such as the 6.7 GW by 2030 discussed under JETP cover grid plants. Captive plants largely sit outside them. CREA estimates that excluding captive coal from retirement would mean 27,000 additional air-pollution deaths and US$20 billion in economic costs.
- Competitiveness. Export buyers increasingly ask for low-carbon metals. A smelter running on coal carries that footprint into every tonne.
- Opportunity. Industrial estates have large, steady loads, land and roofs. Solar plus storage, sized hour by hour, can cut fuel use even where coal stays for night-time supply.
Nickel is most of it
Two policy changes in 2026 touch captive coal. Coal sold to off-grid plants no longer counts towards miners’ domestic market obligation, removing an easy route to cheap compliance. And the government has discussed a moratorium on new smelters making semi-processed products. Neither caps captive emissions. For the industrial angle, see green nickel.
What to watch
- Whether captive plants enter the power-sector emissions trading scheme in phase two.
- Data: official statistics still undercount captive output.
- The aluminium pipeline, which could repeat the nickel story.
Sources
- CREA and Global Energy Monitor, Out of sight, out of control, January 2026
- Global Energy Monitor, 31 GW of captive coal puts Indonesia’s economy and emissions targets at high risk
- Ember, Indonesia’s captive coal giant, September 2026
- CREA, Indonesia’s aluminium downstream, July 2026
- MINING.COM, coal sold to off-grid power plants no longer subject to DMO
Summaries and analysis by Satu Energy. Programme and plan figures are not operating capacity unless stated.
Satu Energy (PT Satu Solusi Energi), Jakarta. Read online and download the chart data at satuenergy.com/insights/indonesia-captive-coal/. Contact: contact@satuenergy.com. This report uses public sources only; figures for plans and programmes are not operating capacity unless stated.